BARC: Accelerating Development at Thruxton Circuit

Commercial development and phased expansion

Client

British Automobile Racing Club (BARC)

Location

Thruxton Circuit, Hampshire

Duration

Phase 1 completed 2025

The Project

Delivering high spec facilities to support motorsport operations

Nationwide Engineering successfully delivered the first phase of works at Thruxton Circuit, completing the extension of the Thruxton Centre for the British Automobile Racing Club (BARC).

This phase included the construction of a steel framed extension with a full internal fit out, creating a high spec environment featuring acoustic panelling, glazed partitions, air conditioned offices, and carpeted finishes throughout. Externally, new tarmac surfacing was installed to provide a clean and practical finish to the surrounding areas.

Nationwide Engineering led the project from inception through to completion, maintaining clear communication and collaborative decision making to ensure the works were delivered on time and within budget.

Following the successful completion of this phase, Nationwide Engineering has been appointed to deliver the next stage of development at Thruxton. This will include the construction of five Romney style hangars, a 108 metre open fronted hangar along the airfield apron, and later in the programme, the replacement of the existing fire station and control tower.

“Nationwide led the whole project on our behalf and thanks to great communication and open discussions, they were able to present options as we went along and guide our decision making throughout. This made it a seamless process and enabled it to be delivered on time and on budget. We are thrilled with both the end result and the process we went through to get here.”

Ben Taylor – CEO, British Automobile Racing Club

 

Browse our other Construction Projects

Delivering a new steel-framed storage facility in Cornwall

Nationwide Engineering has returned to Cornwall to commence a new construction project for Britannia Lanes at Holmbush Road, St ... Explore More

Netherhampton Farm

The homes have been carefully constructed using hand-cut Lincolnshire stone to mirror the original farm buildings and blend in ... Explore More

Warminster Starter Units

The site is located at Furnax Lane, Warminster. The three structures are steel frame with mezzanine levels over a ... Explore More

Storagebase

The site is located on Solstice Park, Amesbury which is a large business park just off the A303. Hibberd ... Explore More

Southern Quarter Gym

The company started promoting itself by opening a small coffee shop which developed into a successful business in itself ... Explore More

Redruth Starter Units

The site also incorporates customer EV parking, HGV access, cycle bays, bin store and landscaping complimented with a traditional ... Explore More

Moto-Lita

The building is founded on mass concrete pad foundations and the ground floor is a ground bearing concrete slab. ... Explore More

Elliott’s Builders Merchants

This new depot provide 5,500m2 of external concrete pavement storage and 1800m2 of show room & sales floor area.Explore More

Steel Frame at The Bluestone Centre, Amesbury

The Bluestone Centre

The Bluestone Centre is an exciting multi-million-pound development of steel framed Business Units situated on Solstice Park, Amesbury in ... Explore More

Discover Adventure Steel Frame, Coombe Bissett

Discover Adventure

Discover Adventure approached Nationwide Engineering to provide a Value Engineering solution to their new Head Office building based in ... Explore More

Birchall Tea Factory in Amesbury

Birchall Tea Factory

This bespoke 29,000ft2 fully solar powered production facility houses state of the art tea processing machines from Italy. The ... Explore More

Nationwide Engineering Group




Call us on: 01722 421 625 enquiries@nationwideengineering.co.uk
  • About
  • Sustainability
  • Armed forces

© 2026 Nationwide Engineering Group|WEBSITE DESIGNED BY BLUE BEE

  • Privacy Policy
  • Cookie Policy
  • Modern Slavery Act Statement