September 2022 - Jan 2024 | Refurbishment Works

Client

Government Property Agency

Location

Companies House, Cardiff

Duration

16 Months

The Project

The Companies House building in Cardiff is a government facility responsible for the registration and oversight of companies in the United Kingdom.

Refurbishment works to the building involved the comprehensive efforts to enhance, upgrade, and revitalize the existing structure.

The 1st Floor Repository – High Level asbestos abatements conducted by Tersus Consultancy. Works involved the safe removal of all asbestos insulating board contained within the repository 1st floor to allow remedial actions to the end bearings as specified by Mott Macdonald. All works were licensed and carried out in conjunction with a LARC.

As part of the life cycle replacement (LCR) programme being rolled out currently by the GPA, a new HV switchgear was installed to a purpose built external GPR enclosure. Built with the specific requirements of housing high-voltage equipment.

Browse our other Rail Projects

Emergency rail infrastructure stabilisation works

Nationwide Engineering delivered critical emergency works at Nightingale Road Viaduct in Guildford on behalf of Network Rail, successfully completing ... Explore More

Reviving a Victorian Icon: Battersea Park Station’s Canopy Gets a Bold New Chapter

Nationwide Engineering delivered the restoration of the historic canopy to Platforms 2 and 3 at Battersea Park Station, a rare surviving ... Explore More

Strength in Structure: Delivering on the CP7 Rail Integrity Programme

Nationwide Engineering continues to play a key role in the delivery of Network Rail’s CP7 Structural Integrity Framework, ... Explore More

Swindon: Restoring Heritage, Expanding Horizons

Nationwide Engineering is delivering the refurbishment and structural upgrade of the historic carriage works in Swindon as part of ... Explore More

Year 5 Wessex UB Refurbs

Sites listed for this project are West Street, Paper Mill Lane, Buckhorn Weston Road, Firgrove Hill, Weycroft River, Raynes ... Explore More

Newbury BGU

The 3 units were housed within a single steel frame building with a total floor area of 3300 sqft. The building ... Explore More

View of Ealing Broadway Station

Ealing Broadway

A prestigious multi-million-pound contract to undertake a significant upgrade to Ealing Broadway Station as part of the new Elizabeth ... Explore More

Rail Workers at Lostock Station

Lostock

The works involved removal and replacement of the existing aged timber trestle platforms to a new alignment. The completed ... Explore More

Year 3 Earthworks

Allowing protection of the embankments from further degradation from voids beneath the railway and reinstating slipped assets such as ... Explore More

Sheffield University USID Roads

The existing main carriageway into the USID site required extensive remedial works undertaking to the footpath and main carriageway.<... Explore More

Platform End Gates

The works involved not only the installation of the platform end gates, but also fencing, anti-tress pass matting, asphalt ... Explore More

Millbrook Scada and DC Roofing Works

The Scope includes erecting GRP Scaffold, installing a new steel frame over the existing roof, then installing ply and ... Explore More

Tunnel Refurbishment

The tunnel itself was not in bad condition and this was identified once Coombes with their specially adapted RRV ... Explore More

Highgate Bridge & Langdale Road Bridge Refurbishment

Highgate Bridge is a 4-span simply supported concrete bridge carries the A635 over the SMJ2 railway lines. BMBC’s ... Explore More

Hatfield Common Multi Storey Car Park

The layout and design of the car park was split over four floors and includes 18 disabled spaces, 10 parent/child ... Explore More

Dorchester West Ramp

This enhances the accessibility for the disabled, those with buggies and people of restricted mobility between the station and ... Explore More

Colmore Gate

Works included the strip out of existing partitions and doors within the area (excluding structural elements), the removal of ... Explore More

Wokingham Footbridge

Preparation and coating system within the encapsulated scaffold areas where the steelwork was to be grit blasted to an ... Explore More

Wessex Culverts Year 2

The project involved the remedial works to 15 culverts throughout the Wessex region. Given the nature of the works we ... Explore More

Nation wide Rail workers

London North Eastern Railway

Stations have included Bradford Interchange, Normanton and Castleford in West Yorkshire, with Bardon Mill and Riding Mill being undertaken ... Explore More

Nationwide Engineering Group




Call us on: 01722 421 625 enquiries@nationwideengineering.co.uk
  • About
  • Sustainability
  • Armed forces

© 2026 Nationwide Engineering Group|WEBSITE DESIGNED BY BLUE BEE

  • Privacy Policy
  • Cookie Policy
  • Modern Slavery Act Statement