Wokingham Footbridge
January 2021- June 2021 | Design, Installation and Refurbishing Works
Client
Network Rail
Location
Wokingham Station Footbridge
Duration
5 Months
The Project
Design and installation of an encapsulation scaffolding to allow blasting and paint works to be carried out.
Preparation and coating system within the encapsulated scaffold areas where the steelwork was to be grit blasted to an expected life service of 25 years. Applied surface tolerant epoxy primer, tolerant epoxy undercoat and polyurethane top coat ( as per M24 coating system).
Preparation and coating system outside the encapsulated scaffold areas ( possession areas) using high pressure wash steelwork head washers. Prepared corroded steelwork to ST3 standard and abraded sound coatings to provide expected service life of 15 years.