Rail Projects

Ealing Broadway

Crossrail – Elizabeth Line

Client

Graham Construction Group

Location

Ealing Broadway Station, London

Duration

8 months

The Project

We are delighted to have been awarded a multi-million-pound contract for a significant upgrade to Ealing Broadway Station as part of the Elizabeth Line (Crossrail) project.

A prestigious multi-million-pound contract to undertake a significant upgrade to Ealing Broadway Station as part of the new Elizabeth Line (Crossrail) project.

Works included the construction of new lifts, canopy foundations and associated civil engineering works on the island platforms. This logistically challenging and technically complex project required working around the busy railway station in close proximity with London Underground and the public.

Construction techniques were developed to maximise normal daytime working while managing construction risks around the operational infrastructure.

Delivering a prestigious project

This is an exciting and technically challenging project that perfectly fits with our capability and experience. We have identified significant Value Engineering opportunities that lower risk and the whole team is looking forward to delivering this prestigious project – Alex McDermott, Managing Director

View of Ealing Broadway Station

Browse our other Rail Projects

Year 3 Earthworks

Allowing protection of the embankments from further degradation from voids beneath the railway and reinstating slipped assets such as ... Explore More

Sheffield University USID Roads

The existing main carriageway into the USID site required extensive remedial works undertaking to the footpath and main carriageway.<... Explore More

Companies House

Refurbishment works to the building involved the comprehensive efforts to enhance, upgrade, and revitalize the existing structure.

... Explore More

Platform End Gates

The works involved not only the installation of the platform end gates, but also fencing, anti-tress pass matting, asphalt ... Explore More

Millbrook Scada and DC Roofing Works

The Scope includes erecting GRP Scaffold, installing a new steel frame over the existing roof, then installing ply and ... Explore More

Tunnel Refurbishment

The tunnel itself was not in bad condition and this was identified once Coombes with their specially adapted RRV ... Explore More

Highgate Bridge & Langdale Road Bridge Refurbishment

Highgate Bridge is a 4-span simply supported concrete bridge carries the A635 over the SMJ2 railway lines. BMBC’s ... Explore More

Hatfield Common Multi Storey Car Park

The layout and design of the car park was split over four floors and includes 18 disabled spaces, 10 parent/child ... Explore More

Dorchester West Ramp

This enhances the accessibility for the disabled, those with buggies and people of restricted mobility between the station and ... Explore More

Colmore Gate

Works included the strip out of existing partitions and doors within the area (excluding structural elements), the removal of ... Explore More

Wokingham Footbridge

Preparation and coating system within the encapsulated scaffold areas where the steelwork was to be grit blasted to an ... Explore More

Wessex Culverts Year 2

The project involved the remedial works to 15 culverts throughout the Wessex region. Given the nature of the works we ... Explore More

Year 5 Wessex UB Refurbs

Sites listed for this project are West Street, Paper Mill Lane, Buckhorn Weston Road, Firgrove Hill, Weycroft River, Raynes ... Explore More

Newbury BGU

The 3 units were housed within a single steel frame building with a total floor area of 3300 sqft. The building ... Explore More

Nation wide Rail workers

London North Eastern Railway

Stations have included Bradford Interchange, Normanton and Castleford in West Yorkshire, with Bardon Mill and Riding Mill being undertaken ... Explore More

Rail Workers at Lostock Station

Lostock

The works involved removal and replacement of the existing aged timber trestle platforms to a new alignment. The completed ... Explore More

Nationwide Engineering Group

Head Office
Units 19-20
The Bluestone Centre
Sun Rise Way, Amesbury
SP4 7YR

Call us on: 01722 421 625 enquiries@nationwideengineering.co.uk
  • About
  • Sustainability
  • Armed forces

© 2023 Nationwide Engineering Group|WEBSITE DESIGNED BY BLUE BEE

  • Privacy Policy
  • Cookie Policy