Year 5 Wessex UB Refurbs
June 2023 - March 2024 | Underbridge Refurbishment
Client
Network Rail
Location
Paper Mill Lane, Alton, Surrey, GU34 2PY
Duration
9 Months
The Project
Underbridge Refurbishment works on 12 bridges across Wessex requiring repainting works delivering a 15-25 year protection. The package includes steelwork and masonry repairs.
Sites listed for this project are West Street, Paper Mill Lane, Buckhorn Weston Road, Firgrove Hill, Weycroft River, Raynes Park, Maumbury Road, Winsham Road, Bagshot Road, Fetcham (Cobham Road), Shoddesden Road & Lower Weybourne/Badshot Lea Bridge.
The structures listed above require new protective coating in accordance with NR standards – NR/L3CIV/039 & NR/L3/CIV/0404. All metallic surfaces to be prepared to SA2.5 with a new protective coat provided in 2 tone green – Forest Green 14C40 & Light Green RAL6021. Temporary works such as scaffolding, encapsulation and pontoons will be required to deliver the works.
The site is located on Cobham Road, in Fetcham, which is a constituency of River Mole. Lies between 2 schools in a small residential community.